Insights · guide

How to prepare a 360 archival installation for a museum opening

Drafted with Insight · edited by The WE ARE VR team

development

Turn one museum walkthrough into the checklist your opening team can actually run.

What's the problem?

A venue walkthrough often produces photographs, measurements and a few WhatsApp notes. Those records help later, but they do not tell an opening team what to do at 09:55 when one headset has no sound.

Museum installations combine technical and public-facing work. Playback must start reliably. Sound must be audible without leaking into nearby galleries. Visitors need a clear route, seating options and help. Staff need simple decisions when equipment misbehaves.

Johannesburg adds practical variables: summer heat, power interruptions, busy opening crowds and venue rules. A 360 archival work also needs time. Visitors may stay longer than expected because they want to inspect details, listen again or talk afterwards.

The common mistake is treating the walkthrough as a design visit. I prefer treating it as the first full rehearsal, even before every asset is final.

What's the solution?

Use a five-part walkthrough: playback, sound, access, staffing and recovery. For each part, write four things: what you observed, what you decided, who owns it and how you will test it.

Start at the visitor entrance and move through the experience in order. Do not inspect the room from the technician's corner. Walk the route a first-time visitor will take.

For playback, record the exact device, file version, launch method and expected ending. Test a cold start, meaning a start after the device has been fully powered off. Note where cables, chargers and spare batteries live.

For sound, test with the room occupied if possible. Empty galleries can sound very different. Check spoken words, volume controls, headphone fit and sound spill near neighbouring exhibits. Decide one approved volume setting, then mark it physically or record it on the checklist.

For access, test the route with a chair in place and with someone assisting. Check turning space, trip risks, captions, glasses fit and where a visitor can stop without blocking the queue. Ask museum staff about emergency routes before fixing any furniture.

For staffing, write a short opening script and three support prompts. Staff should know how to begin the experience, adjust fit and end a session politely. Give each shift one named technical lead. "Someone from production" is not a staffing plan.

For recovery, rehearse the likely failures. Remove power. Disconnect audio. Close the playback app. Time how long a trained staff member takes to restore each one. Keep a printed recovery card at the station, because the failing device may also hold your digital instructions. (Machines enjoy timing.)

For To All Who Live In It, launching as a 360° archival installation at Johannesburg's Apartheid Museum on 5 December 2026, this method turns the building visit into an operating document. The checklist should include the museum's own procedures, not sit beside them as a separate production plan.

Photograph each final cable path and control setting. Attach those images to the checklist. A useful checklist matches the room people will enter, not the room you remember.

What's next?

  1. Book a 45-minute venue walk with one museum staff member and one operator.
  2. Test one complete visitor cycle, including entry, playback, exit and equipment reset.
  3. Print a one-page opening checklist, then ask someone uninvolved to run it.

Share what you make, or send us the awkward venue problem you are trying to solve.

The WE ARE VR team