Insights · guide
What belongs in a complete Johannesburg XR quote
Drafted with Insight · edited by The WE ARE VR team
development

A vague XR quote is an expensive argument waiting for a venue.
I wrote this because Jozi projects often move quickly from idea to approval. A complete quote gives clients and suppliers the same picture before deposits, bookings and production begin.
What's the problem?
A total price can look tidy while hiding several unanswered questions. The quote may say “VR activation” without naming the final deliverables, headset count or operating hours.
That gap becomes painful near event day. The client expects six working stations. The supplier priced four headsets, with one spare and three active stations. Both read the same quote and imagined different setups.
Revision limits cause similar trouble in content projects. “Includes changes” could mean one feedback round or continuing edits until launch. Ask for the number of revision rounds, what each round covers, and the hourly or daily rate after that limit.
Johannesburg logistics also need their own lines. Travel to a Sandton venue is different from a multi-day install outside Gauteng. Parking, tolls, loading access, accommodation and after-hours setup can all change the real cost. (The headset rarely volunteers to pay for parking.)
Tax is another common source of confusion. Check whether prices include VAT, whether the supplier is VAT registered, and which items may change once quantities are confirmed.
What's the solution?
Use a seven-part quote check before you approve the work: deliverables, revisions, devices, event support, travel, tax and handover.
Deliverables should name what you receive. For an AR filter, that could include the approved concept, 3D assets, build files, platform submission and a tested release. For an event, it could include headset stations, branded signage and visitor reporting.
Devices should be specific. Record the model, quantity, spare units, controllers, charging plan, computers and network needs. “Headsets supplied” is too loose for production planning.
Event support should state crew numbers, working hours, setup time, strike time and overtime rates. Strike means removing and packing the installation after the event. Also confirm who handles queues, hygiene, device resets and basic visitor guidance.
Travel needs a clear boundary. Ask which areas are included, what rate applies beyond them, and who pays for parking or accommodation. A supplier based in Johannesburg may still charge for a pre-dawn call time in Pretoria.
Tax should appear beside the subtotal, not emerge later. Handover should list the files, accounts, passwords, licences and training you receive after delivery. If the supplier keeps source files, that should be written down too.
Here is a useful test: another XR professional should be able to read the quote and understand what must be delivered, where, when and with which equipment. If they cannot, the quote needs another pass.
What's next?
- Take one live quote and mark every line that answers one of the seven checks. Circle any missing category.
- Ask the supplier to add assumptions and exclusions in writing. Keep these inside the quote, not scattered across WhatsApp messages.
- Confirm the final total, VAT treatment, payment dates and handover items before approving the deposit.
Share your quote checklist or send us the clause that keeps causing trouble.
The WE ARE VR team
